Automotive Casting from China: A Buyer's Checklist Before Placing Orders

Automotive is the most demanding casting application. Before you place a single order, run through this 12-item checklist. Every item you skip is a potential quality crisis, a rejected shipment, or a damaged supplier relationship.

Pre-Order Checklist (12 Action Items)

  1. ☐ Verify IATF 16949 certificate — Check at oversight.iatfglobaloversight.org. Does the scope cover your casting process and materials?
  2. ☐ Request APQP milestone plan — Advanced Product Quality Planning timeline: design validation → tooling → first article → PPAP → production
  3. ☐ Define PPAP submission level in writing — Level 3 is standard; specify which customer-specific requirements apply
  4. ☐ Establish Cpk requirements by dimension — Critical: ≥1.67; Significant: ≥1.33; General: ≥1.00. Don't accept "we'll try our best"
  5. ☐ Specify all special characteristics — Mark drawings with safety-critical and significant characteristics. Get foundry sign-off
  6. ☐ Define first article inspection requirements — CMM report on all dimensions, material test report, hardness test
  7. ☐ Agree on measurement system (MSA) — Gage R&R must be <10% of process variation
  8. ☐ Specify packaging and labeling requirements — Part number, lot number, heat number traceability on every box
  9. ☐ Define freight terms and Incoterms — DDP (delivered duty paid) or CIF (cost insurance freight)? Who arranges outbound inspection?
  10. ☐ Establish defect escalation process — What's the response time for 8D reports? Who approves corrective actions?
  11. ☐ Set up regular quality review cadence — Monthly quality metrics call; quarterly on-site audit; annual supplier review
  12. ☐ Agree on tooling ownership and IP protection — CAD files, patterns, dies owned by buyer. Non-negotiable.

Key Quality Requirements to Define

RequirementStandardAction
MaterialGB/T 1591 / ASTM / JISSpecify exact standard and grade
Surface treatmentE-coat, powder coat, Zn platingDefine specification and min. thickness
PPAP formatAIAG PPAP 4th EditionSpecify submission level
CMM inspectionFirst article + per batchDefine sampling plan
Weld repairWritten approval requiredDefine when repair is/isn't acceptable
Corrective action8D report within 5 daysEscalation path defined

Most Common Automotive Casting Quality Issues

Need an Automotive Casting Supplier in China?

We work with IATF 16949-certified foundries experienced in automotive PPAP Level 3 submissions. Full quality documentation, Cpk tracking, and regular audits included.

Get Automotive Casting Quote →