EN 10204 3.1 Certificate for Castings: What It Proves, and How to Verify It

Inspection certificate on a foundry quality desk next to tensile test bars and a heat-numbered casting

Need the certificate pack before you pay? Send the grade and the standard your customer audits against. You get the 3.1 certificate, the NDT report and the dimensional layout for the heat, with the heat number cross-checked against the cast-on marking.

Request the document set →

Most buyers treat the EN 10204 3.1 certificate as a box that gets ticked at shipment. It is worth more than that, and it is also faked more often than most buyers realise — not usually by inventing a whole document, but by printing a clean template and typing in your heat number at the end.

This page is about the second problem. What the certificate actually certifies, which fields carry weight, and how to check it in about twenty minutes without a metallurgist on the call.

What EN 10204 is, and what “3.1” pins down

EN 10204 is the European standard that defines the types of inspection documents a manufacturer can supply with metallic products. The version cited on almost every certificate in circulation is EN 10204:2004. It defines four types, and the differences between them are entirely about who signs and whether real test results are attached.

TypeIssued byCarries test resultsIndependent of production
2.1ManufacturerNo — declaration of compliance onlyNo
2.2ManufacturerNo — declaration plus non-specific resultsNo
3.1Manufacturer’s inspection representativeYes — specific, per heatYes, internal
3.2Manufacturer + third party designated by the purchaserYes — specific, per heatYes, external

The word that matters in the 3.1 row is independent. The certificate has to be signed by someone in the manufacturer’s organisation who does not report into the melting or molding departments. That is a structural requirement, and it is the reason a 3.1 is worth more than a 2.2 even though both are printed on the same letterhead.

The eight fields a valid 3.1 must carry

Strip away the layout and a compliant 3.1 contains eight things. If any of them is missing, the document is not a 3.1 regardless of its heading.

The heat number is the only field that proves anything

Every other field can be typed by anyone with a laptop. The heat number is the one field that has to correspond to a physical object, which is why it is where verification should start.

Ask for three things and put them side by side:

  1. The heat number printed on the 3.1.
  2. The heat number cast, stencilled or tag-wired onto the parts — and a photograph of it, not a description.
  3. The heat number on the packing list and the shipping documents.
Heat number stencilled on a casting and repeated on a wired metal tag
Two independent markings of the same heat number are harder to fabricate than one.

When all three agree, the certificate is at least anchored to something real. When they disagree, the usual explanation is not fraud but sloppiness: parts from a second heat were substituted to fill the order and nobody updated the paperwork. That is still a nonconformity, and it is exactly the kind that surfaces during your customer’s audit rather than during yours.

How to spot a certificate typed after the fact

None of these is proof on its own. Two or three together justify a request for the original heat records.

What a 3.1 does not cover

This is where buyers most often over-read the document. A 3.1 is a statement about the metal, not about the part.

QuestionDoes a 3.1 answer it?
Is the chemistry within the grade?Yes
Do the mechanical properties meet the grade?Yes, for the test bar
Is the wall thickness of my casting correct?No — needs a dimensional report
Are there internal shrink cavities?No — needs radiography or ultrasonic testing
Is the surface free of penetration defects?No — needs penetrant or magnetic particle inspection
Is the microstructure right for my application?No — needs a metallographic report, requested separately

The test bar is also its own caveat. Mechanical results come from a separately cast test piece or a coupon attached to the casting, poured from the same heat and heat-treated with it. That is a good proxy for the casting, but it is not the casting. For thick sections and for parts where the test bar is thinner than the section it represents, ask how the test piece was positioned relative to the casting and whether it was cast in the same mold.

When you should insist on 3.2 instead

A 3.1 is self-declared: the manufacturer’s own inspection department signs it. That is acceptable for the large majority of general engineering castings, and it is what most Chinese foundries issue by default.

Go to 3.2 when the consequence of a bad heat is not a rejected shipment but an injury, a recall or an insurance dispute. Three triggers in practice:

A 3.2 requires a third party designated by you, not by the supplier. If the foundry proposes their regular inspection body, the independence you are paying for is thinner than the paper it is printed on. Nominate the body yourself, or at minimum approve it in writing.

Budget the delay honestly: a 3.2 typically adds one to two weeks to shipment, because the third party has to witness the tests rather than review the results afterwards.

What to hold alongside the 3.1

For a general engineering casting, a 3.1 alone is adequate. For anything that will be audited downstream, the document set that actually protects you is four items:

  1. The 3.1 certificate, per heat, with a named signatory.
  2. The NDT report, stating the method, the acceptance level, the coverage and the operator’s certification level. A report that says “tested, OK” is not a report.
  3. The dimensional report, listing every drawing dimension that is checked, with the actual measured value against nominal and tolerance — not a page of ticks.
  4. A heat traceability chart mapping heat number to part number to quantity to carton, which is the document that lets you answer a recall question two years later.

A twenty-minute verification routine

Run this before releasing final payment rather than after the container is loaded. Each step is minutes, and together they catch the overwhelming majority of document problems.

  1. Count the heats in the shipment. Count the heat lines on the certificate. They should be equal.
  2. Find the heat number on the physical parts — photograph, not description.
  3. Match the heat number against the packing list and the commercial invoice.
  4. Check the manufacturer’s name and address on the certificate against the plant that appears in your audit notes.
  5. Read the chemistry as values, not ranges, and sanity-check carbon and silicon against the grade.
  6. Confirm there is a printed name and a role next to the signature.
  7. Open the PDF properties and compare the creation date to the shipment date.
  8. Ask one question you already know the answer to — for example which furnace poured the heat — and see whether the answer is immediate or arrives a day later.

That last one is the cheapest test of all. A foundry that poured the metal knows; a supplier who assembled a document pack has to go and ask someone.

Related verification pages

Ask for a specimen certificate pack

Tell us the material grade, the casting process and which standard your customer audits against. We send a redacted specimen 3.1, an NDT report and a dimensional layout from the same heat, so you can see the format before you place an order.

Prefer email? cfwc@163.com · WhatsApp +86 159 4126 7000